Temporary power

Power for as long as the job lasts.

Temporary power without a fuel account, a noise complaint or a spill plan — for construction, events, film, emergency response and industrial sites.

Request a quoteRental options
Days to monthsNo fuel logisticsSilentIndoor safeUS and international

What temporary power actually has to solve

Temporary power exists because the permanent supply is absent, insufficient or not yet energised. That means the specification is usually written quickly, sized for the worst case, and delivered by whatever the hire desk had available.

The result is a generator running far below its rating for weeks, with a fuel account, a servicing schedule, a noise condition and a spill plan attached to it. None of that was the actual requirement — the requirement was electricity.

Battery storage meets the same requirement differently: it delivers the load from stored energy and refills when it suits, from the grid, from solar or from a right-sized generator that runs a fraction of the hours.

Specification

How to specify temporary power properly

What to establishWhy it mattersTypical source
Largest simultaneous load (kW)Sets the power rating the system must deliverEquipment schedule plus starting currents
Total energy per run (kWh)Sets runtime and therefore the pack sizeLoad times hours across a working day
Voltage and phaseDetermines the model and receptacle setSite distribution and equipment plates
Recharge windowDetermines whether one unit is enoughShift pattern and available supply
Duration on siteDecides rent versus buyProgramme or event schedule
ConstraintsNoise limits, indoor use, emissions commitmentsConsent conditions and client requirements

By sector

Temporary power by application

Questions answered

Frequently asked questions

What is temporary power and when do you need it?

Temporary power is electricity supplied to a site that has no permanent connection, an insufficient one, or one that is not yet energised. It is standard on construction sites, events, film locations, disaster response and during facility upgrades.

What are the best alternatives to diesel generators for temporary power?

Battery energy storage is the main one, either as a full replacement or as a hybrid where a right-sized generator recharges the battery. Grid connections, where available, and solar with storage are the others.

How long can temporary battery power last?

From hours to indefinitely, depending on the load and the recharge arrangement. A 30 kWh trailer covers a typical construction site for 4 to 8 hours or emergency lighting and communications for up to seven days; with solar or scheduled recharging there is no fixed limit.

Keep reading

Related pages

Get in touch

Request a quote

Tell us the site, the load and the runtime you need. Our Austin engineering team comes back with a configuration, a runtime estimate and a price.

  • Sizing and runtime estimate for your actual load
  • 120V/60Hz and 230V/50Hz configurations
  • Rental, purchase, lease and OEM enquiries all welcome
  • Buy American Act documentation available on request
  • Financing available from just $700/month

+1 512-316-7347
info@pulsar.industries
WhatsApp +1 512-585-8293

Send an enquiry

We reply within one business day. Your details are never sold or shared.

WhatsApp us